Church Barn

MILTON KEYNES

SCROLL TO EXPLORE

A conservation-area barn conversion delivering A-rated performance through smart engineering and traditional craftsmanship.

Project Summary

A high-performance barn conversion in New Bradwell, delivering a Grade A EPC (score 93) through a fabric-first approach, air-source heat pump, underfloor heating, and solar PV with battery storage. Total floor area 163 m². Located within the local conservation area.

Sustainability Highlights

A-rated EPC achieved via envelope performance plus ASHP + solar PV (with on-site storage) to cut grid demand.

Very low operational carbon and low running costs relative to UK averages.

Click here for EPC certificate PDF

Role: Developer & Main Contractor - Pauley Ltd

Client: Private

Architect/Consultants: Client-appointed; daily coordination by Pauley Ltd

Added value: Optimised design/spec and proactive cost management throughout.

Collaboration: Worked sensitively with neighbours and in partnership with Milton Keynes City Council Planning & Conservation Officers.

Key Facts

  • Property type: Detached, single-storey home (barn conversion).

  • EPC: A (93) – valid to 20 Aug 2035.

  • Floor area: 163 m².

  • Energy & systems: Air-source heat pump, zoned time/temperature control, underfloor heating, hot water from main system, excellent lighting efficiency.

  • Low/zero-carbon tech: Solar photovoltaics and PV-independent battery storage.

  • Primary energy use: 18 kWh/m²/yr; CO₂ emissions ~0.3 t/yr (A).

  • Setting: Within a conservation area.

Construction of Church Barn

Concept

Build

Completion

Next
Next

Our Lady of Perpetual Succour, Great Billing